Ordering Veneer for Prototypes and Production

Start With the Finished Product and Work Backward

Before choosing a pack, define the deck or laminated part you intend to build. The correct order depends on the number of plies, sheet role, dimensions, grain direction, grade, color, expected waste, testing, and production quantity.

Information to Gather

  • Finished deck length and maximum width
  • Mold length, width, and usable pressing area
  • Number of plies in each deck
  • Number and position of long-grain and crossband plies
  • Visible face requirements
  • Natural or dyed color requirements
  • Number of finished decks required
  • Allowance for setup, testing, sorting, and rejected parts

Basic Quantity Planning

Multiply the number of sheets required per deck by the number of decks. Then add a practical allowance for process testing, damage, sorting, setup, and unexpected loss. Do not plan a production order with no spare material.

Prototype Orders

A prototype order should provide enough material to test more than one pressing condition when possible. Record each trial separately. Changing multiple variables at once makes it difficult to determine why one result is better or worse.

Production Orders

For recurring production, specify the products and critical requirements consistently. Consider ordering enough material for the full run when color or visual consistency is important. Large orders may require a production schedule, freight quote, deposit, or separate written specifications.

Mixed Packs

Mixed packs can simplify ordering when they are designed around a known layup. Read the pack description carefully to confirm the number of face, long-grain, and crossband sheets. A generic sheet count does not necessarily provide the correct ratio for every construction.

Custom and Recurring Supply

For recurring quantities, provide anticipated monthly or quarterly usage, dimensions, grade mix, color mix, packaging requirements, and delivery location. Availability, lead time, minimums, and pricing may depend on the consistency and scale of the program.